MostynCopper presents at TEFMA

MostynCopper Senior Project Manager Isabelle Stephens had the honour of presenting at the recent TEFMA conference in Brisbane and was joined by UNSW Chief Operating Officer (Randwick Health Precincts at UNSW) Emma Francis.

The focus of the presentation was the recently completed UNSW Integrated Acute Services Building, a collaboration between UNSW and the Prince of Wales Hospital through South Eastern Sydney Local Health District.

The presentation specifically looked at the high level of planning and collaboration required between both the academic and medical institutions and the role played by MostynCopper to ensure the successful completion of the project and the smooth operational function on-going.